Labs
About
Projects
Services
Drilling Resources
NATA
Careers
Contact Us
Geotechnical
Geotechnical Engineering
In-house engineers, investigation to report
Bearing Capacity Assessments
Confirm the ground carries the proposed load
Plate Load Testing
On-site settlement measured under real load
Drilling Resources
Our own truck and trailer-mounted rig fleet
Materials Testing
Laboratory Testing
Soil, aggregate, concrete, rock and asphalt
Field Testing
Compaction, slump, cylinders and coring on site
Level 1 Fill Certification
Supervision and sign-off for engineered fill
Concrete Testing
Strength, slump, shrinkage and air content
Land & Environment
Residential Site Classification
AS 2870 classification before your slab
Land Capability Assessment
On-site wastewater where there is no sewer
Waste Classification
ENM, VENM and PFAS — re-use or dispose
NATA Accredited Labs
What our accreditation covers, lab by lab
NATA Accredited
130+ accredited test methods
Wagga Wagga, Griffith and Albury/Wodonga.
Explore our laboratories
Wagga
|
Griffith
|
Albury

AS 1547 · effluent disposal assessment

Land Capability Assessment

No sewer, no problem. The report your council needs before a septic system is designed — sized to your soil profile, your rainfall and your block.

Percolation testing for a land capability assessment
$1,100 +GSTLocal price at all three laboratories
25 yearsOf interpolated weather data in our modelling
7 system typesDesigned across all approved Australian systems
One visitCombined with your soil test to save mobilisation

When the block is not on sewer

If your building site is not connected to council sewer mains, you need a Land Capability Assessment — also called an Effluent Disposal Assessment — so the septic system is designed for the soil profile underneath it. Applying effluent to land takes care and expertise, and new builds are under closer scrutiny than they used to be. We consult with every local council to keep the design compliant.

We also assess existing systems regularly. If you suspect yours is failing, or you simply have questions about it, call us.

Modelled on 25 years of local weather

We use proprietary nutrient and water balance modelling built on interpolated weather data covering the past 25 years. That lets our geotechnical engineers write a site-specific report with recommendations that produce a cost-efficient, long-lasting system — without putting the environment at risk.

Systems we design for

Every approved Australian system, matched to the soil and the site rather than the catalogue.

  • Absorption trenches
  • Subsurface irrigation
  • Composting toilets
  • Wetlands
  • Evapotranspiration beds
  • Low pressure effluent (LPED)
  • Mound systems

Common questions

How much does a Land Capability Assessment cost?

$1,100 +GST as a local job from any of our three laboratories. Booked at the same time as your site classification it saves a second mobilisation, so the pair is cheaper than ordering them separately.

Do I actually need one?

If the block has no connection to council sewer, yes — councils require it before approving an on-site wastewater system. It is a separate report from your soil test, though we usually do both in the one visit.

My existing septic system seems to be failing — can you help?

Yes. We regularly assess existing systems, identify why one is underperforming and recommend what will fix it. Call us and describe what you are seeing.

Which type of system will I end up with?

That is what the assessment determines. Soil permeability, block size, slope, setbacks and rainfall all narrow the options — the report recommends the system that suits your site and will keep working long-term.

Discuss your project

Speak to one of our geotechnical engineers — no call centre, no sales script.

Wagga Wagga(02) 6939 5555
North Albury(02) 6040 1661
Contact details
Wagga Wagga | Griffith | Albury / Wodonga
(02) 6939 5555
Angry Ant Web Design | Matt Beaver Photography